Each boiler is inspected once a year, January 1 to December 31, and the report goes into DOB NOW within 14 days. Defects are corrected within 90 days and affirmed by day 104. The cycle, the reports and the corrections sit on the building’s file, with each deadline counted for you.

  • One cycle per boiler per year
  • 14, 90 and 104 days counted
  • 14 days free, no card
412 W 148th StBuilt 1931 · 12 units
  • BldgBoiler inspection 2026Inspected Mar 4 · defects to correctDone
  • BldgFile the inspection reportFiled Mar 12 · tracking number on fileDone
  • BldgCorrect the boiler defectsDue Jun 2 · then the affirmationDue
  • BldgBoiler inspection 2027Any day Jan 1 – Dec 31Soon

Sample data. Not real records.

Why the records matter

A calendar year, three clocks.

The inspection belongs to the year. The report, the corrections and the affirmation each run from a date of their own.

Dec 31

The cycle runs January 1 to December 31: one inspection a year for a low-pressure boiler, an internal and an external one for a high-pressure boiler.

NYC Admin Code §28-303.2; 1 RCNY §103-01, §103-05
14 days

From the inspection to its report in DOB NOW, $30 per boiler. A late report is taken until January 14 of the next year at $50 a month, up to $600; after that it has expired: $1,000 and a new inspection.

NYC Admin Code §28-303.7; 1 RCNY §103-01(c), (e), (f)
90 days

To correct the defects the inspection found, then 14 days to file the affirmation of correction, and never more than 104 days after the inspection.

NYC Admin Code §28-303.7.1; DOB, Boiler compliance

What the law asks

An inspection a year, a report in 14 days.

Every boiler in a residential building of six units or more, and in any commercial or mixed-use building. Low-pressure boilers in residential buildings of five units or fewer are exempt, and so is a boiler inside one apartment that heats only that apartment.

Last verified Oct 14, 2026

  1. 01The yearly inspectionBy a qualified boiler inspector between January 1 and December 31: the boiler, its controls and safety devices, the flue to the chimney and the combustion air. Low-pressure inspections at least six months apart.
  2. 02High pressure: internal and externalAn insurance company’s inspector does both, about six months apart, and tells DOB 10 days before the internal one. Tenants get 48 hours’ notice of the shutdown, at each unit and in the lobby.
  3. 03The report in DOB NOW, 14 daysThe inspector files it in DOB NOW: Safety, $30 per boiler. Keep the report and its tracking number: DOB accepts either as proof.
  4. 04Defects: 90 days, then the affirmationCorrect them within 90 days of the inspection, and file the affirmation of correction within 14 days of the correction. DOB grants up to two 45-day extensions, asked for before the deadline, $15 each.
  5. 05104 days, the hard stopAn affirmation filed more than 104 days after the inspection is rejected as expired, and the failure-to-correct penalty is $1,000 per boiler.
  6. 06A boiler removedWritten notice within 30 days of the removal, filed by a licensed professional in DOB NOW: Build.

Your year

The boiler year, on one calendar.

  1. Jan 1 – Dec 31InspectAny day in the cycle; a high-pressure boiler twice, about six months apart.
  2. Within 14 daysFile the reportIn DOB NOW, $30 per boiler. Record the tracking number.
  3. Within 90 daysCorrect the defectsThen the affirmation within 14 days, never after day 104.
  4. By Jan 14Last day for a late reportWith the late penalty. After it, the report has expired.

How it works

Every unit, every deadline, every report. One file.

  1. 01

    Add your buildings

    Address, year built and every unit. Type them in or import a CSV from your spreadsheet.

  2. 02

    See what each unit owes

    The app lists what each unit owes under NYC’s laws as we read them, and when. You get a reminder before each deadline.

  3. 03

    Log it on your phone

    Notices, tenant replies, visits, clearances and certificates, each with its date and the report or photo.

  4. 04

    Hand over one file

    When HPD asks, download every record for a building as one PDF, in the order HPD asks for them.

Pricing

14 days free. Then a plan by your units.

No card to start. Four plans by the number of units you track; pay yearly and two months are free. Common areas and buildings you have sold are not counted. Unlimited people, records and photos on every plan. Stop paying and the account moves to a free Archive plan: every record stays readable and downloadable, nothing new can be added.

Start free
  • Starter

    Up to 10 units

    $9/ month

    or $90 a year

    A house with a rented unit, a two- or three-family, a small building.

  • Building

    Up to 40 units

    $39/ month

    or $390 a year

    A few buildings, or one larger one.

  • Portfolio

    Up to 120 units

    $99/ month

    or $990 a year

    A portfolio across the city.

  • Manager

    Up to 500 units

    $349/ month

    or $3490 a year

    A management company.

Over 500 units: from $0.40 a unit a month, at least $349 a month, billed yearly on an invoice. Email [email protected].

Which boilers need the yearly inspection?

Every boiler in a residential building of six units or more, and in any commercial or mixed-use building. Exempt: low-pressure boilers in residential buildings of five units or fewer, and a boiler inside one apartment that serves only that apartment.

What does a missed inspection cost?

A report not filed by January 14 of the next year has expired: the failure-to-file penalty is $1,000 per boiler, and the violation stays on the property until it is paid and a current report is filed. Open boiler violations hold up a final certificate of occupancy.

Is it 45 days to file, or 14?

14. Local Law 126 of 2021 changed the deadlines from January 1, 2022: 14 days to file the report, 90 days to correct defects. Some DOB pages still show the old 45 and 180 days.

Does ViolationProof file with DOB?

No. Your inspector files the report in DOB NOW. ViolationProof counts the cycle, the 14 days, the 90 days and the 104-day stop, and keeps the reports and tracking numbers on the building’s file.

Start

Your boilers, filed on time.

Add your buildings, record this year’s inspection and its report, and see the next deadline for each boiler. 14 days free, no card; then from $9 a month.

Start free
  • 14 days free, no card
  • Sign in with a code from your email, no password
  • Your records stay yours: download the file any time, and if you stop paying they stay readable on a free Archive plan

Units somewhere we don’t cover yet, or a question about your city’s law? Tell us where you are, and we write back.

How do you track lead paint records today?

Optional. You can join without it.

We email you only about ViolationProof. To stop them, reply to any of them or write to [email protected]. See the Privacy Policy.